State Seeks Public Comment
On 70S alignment permit request



State Seeks Public CommentOn 70S alignment permit request

RAINBOW FALLS

One state agency is seeking public comment on a permit request from another regarding plans to widen Highway 70S in Cannon County.

The Tennessee Department of Transportation is seeking the permit from the Tennessee Department of Environment and Conservation because the project will result in loss of wetlands, degradation to water quality and change water flow.

The plan for the new alignment of 70S (SR-1) will impact the current flow of water to Rainbow Falls, which is the second largest waterfall in Cannon County. Subsequently, it will also impact water flow in Parchorn Branch.

With public input, it is possible that TDOT will take extra percautions as it puts the new roadway in. It is also possible, with public input, that it consider pushing the the alignment as far as practicable away from Rainbow Falls.

A specific crawfish species that only in found in Cannon County in Parchcorn Branch, just downstream from Rainbow Falls, could also be impacted by the new 70S alignment.

Following is the notice from TDEC seeking comment on the TDOT project:

PUBLIC NOTICE

File Number: NRS 10.162 Notice Date: Expiration Date:

September 9, 2010 - October 9, 2010

Pursuant to Chapter 1200-4-7 of the Department's rules, the proposed activity described below has been submitted for approval under an Aquatic Resource Alteration Permit (this also includes §401 Water Quality Certifications). This notice is intended to inform interested parties of this permit application and to ask for comments and information necessary to determine possible impacts to water quality No decision has been made whether to issue or deny this application.

APPLICANT: Tennessee Department of Transportation
Attn: Khalid Ahmed
Suite 900, James K. Polk Building
505 Deaderick Street
Nashville, Tennessee 37246
615-253-0021

LOCATION: The proposed alterations are located along a proposed alignment of SR-1 from Centertown in Warren County to SR-281 in Cannon County. The proposed SR-1 alignment would be on a new alignment to the northeast of the existing SR-1.

PROJECT DESCRIPTION / PURPOSE: According to the applicant the current roadway configuration is inadequate to meet the increasing traffic demand, and the highway's traffic rate is higher than the statewide average. This proposed alignment is part of an overall plan to widen SR-1 from west of Woodbury to east of McMinnville. In order to construct the proposed alignment the applicant proposes to impact several streams and wetlands.

Site # 1: Sta. 153+85.02, 35.7944°N / 85.9957°W
Unnamed tributary to Parchcorn Hollow Branch (STR-1A)
Existing: 260 ft. of open channel
Proposed: 222 ft. of 36 in. RCP including the proposed U type concrete end wall at the inlet, USBR type energy dissipater at the outlet and 13 ft. of rip-rap at the outlet
Mitigation: 222 ft. of encapsulation and 25 ft. of stream loss would be compensated for by payment to the Tennessee Stream Mitigation Program (TSMP) in the amount of $49,400.00.

Site #2: Sta. 159+89.79, 35.7928°N / 85.9954 °W
Unnamed tributary to Parchcorn Hollow Branch (STR-1)
Existing: 234 ft. of open channel
Proposed: Rock fill in the 234 ft. of the existing channel from its source to the outlet of the proposed 24 in culvert and 253 ft. of 24 in RCP which include 222
ft of 24 in RCP, 8 ft rip-rap and 7 ft. energy dissipater at the outlet, and 16 ft. concrete end wall at the inlet.
Public Notice, NRS 10.162
Mitigation: 234 ft. of encapsulation would be compensated for by payment to the TSMP in the amount of $46,800.00

Site #3: Sta. 169+05.79, 35.7891°N / 85.9924°W
Unnamed tributary to Parchcorn Hollow Branch (STR-2)
Existing: 176 ft. of open channel
Proposed: Rock fill in the 176 ft. of the existing channel
Mitigation: 176 ft. of stream loss would be compensated for by payment to the TSMP in the amount of $35,200.00

Site #4: Sta. 196+00.00, 35.7828°N / 85.9864°W
Wetland (WTL-1)
Proposed: Area of permanent wetland impact = 0.821 acre
Area of temporary wetland impact = 0.192 acre
Installation of 6 in. water line in same area as temporary impact area
Mitigation: 0.821 ac. of permanent wetland loss would be compensated for by purchasing, at a 2:1 ratio, 1.64 acres of wetland restoration credits from
the Short Mountain Wetland Mitigation Site

Site # 5: Sta. 240+48.33, 35.7721°N / 85.9787°W
Crane Branch (STR-3)
Existing: 358 ft. of open channel
Proposed: 286 ft. of 2 @ 12 ft. x 12 ft. concrete box culvert.
46 ft. of rip-rap at outlet of the proposed culvert.
20 ft. of open channel between the wing walls at the inlet
Mitigation: 286 ft. of encapsulation and 6 ft. of stream loss would be compensated for by payment to the TSMP in the amount of $58,400.00

Site # 6: Sta. 270+63.12, 35.7657°N / 85.9737°W
Unnamed tributary to Youngblood Creek (STR-4)
Existing: 225 ft. of open channel
Proposed: 174 ft. of 6 ft. x 4 ft. concrete box culvert.
18 ft. of concrete energy dissipator at the outlet
24 ft. of rip-rap at the outlet
4 ft. of open channel between the wing walls at the inlet
Mitigation: 5 ft. of stream loss would be compensated for by payment to the TSMP in the amount of $1,000.00

Site #7: Sta. 321+58.14, 35.7533°N / 85.9644°W
Unnamed tributary to Youngblood Creek (STR-5)
Existing: 229 ft. of open channel
Proposed: 152 ft. of 8 ft. x 4 ft. concrete box culvert.
20 ft. of concrete energy dissipator at the outlet
32 ft. of rip-rap at the outlet
7 ft. of open channel between the wing walls at the inlet
Mitigation: 18 ft. of stream loss would be compensated for by payment to the TSMP in the amount of $3,600.00.

Site #8: Sta. 382+60.00, 35.7435°N / 85.9464°W
Wetland (WTL-2)
Proposed: Area of permanent wetland impact = 0.462 acre
Area of temporary wetland impact = 0.331 acre
Mitigation: 0.462 ac. of permanent wetland loss would be compensated for by purchasing, at a 2:1 ratio, 0.924 acres of wetland restoration credits from the Short Mountain Wetland Mitigation Site

Site #9: Sta. 388+30.00, 35.7430°N / 85.9457°W
Miller Branch (STR-6)
Proposed: two 4-span concrete girder bridge (43.25 ft. width X 360 ft. length ) and associated rip-rap on the bridge abutments

Site #10: Sta. 441+00.00, 35.7333°N / 85.9326°W
Wetland (WTL-B)
Proposed: Area of permanent wetland impact = 0.138 acre
Area of temporary wetland impact = 0.024 acre
Mitigation: 0.138 ac. of permanent wetland loss would be compensated for by purchasing, at a 2:1 ratio, 0.276 acres of wetland restoration credits from the Short Mountain Wetland Mitigation Site

Site #11: Sta. 456+50.00, 35.7296°N / 85.9203°W
Wetland (WTL-A)
Proposed: Area of permanent wetland impact = 0.06 acre
Mitigation: 0.06 ac. of permanent wetland loss would be compensated for by purchasing, at a 2:1 ratio, 0.12 acres of wetland restoration credits from
the Short Mountain Wetland Mitigation Site

DEGRADATION: In accordance with the Tennessee Antidegradation Statement (Rule 1200-4-3-.06), the division has determined that the proposed activities at sites #1, #2 and #5 will result in degradation to water quality.

WATERSHED / WATERBODY DESCRIPTION: The project is predominantly located in the Collins River watershed (HUC 05130107). A small portion of the western end of the project is within the Stones River watershed (HUC 05130203).

The Collins River watershed drains approximately 800 mi? and empties into the Caney Fork River. More information on the Collins River watershed can be found on the department's website at http://www.tennessee.gov/environment/watersheds/two/collins/.

The Stones River watershed drains approximately 900 mi? and empties into the Cumberland River. More information on the Stones River watershed can be found on the department's website at http://www.tennessee.gov/environment/watersheds/one/stones/. Streams 1 and 2 are located in the Stones River watershed, and all other streams and wetlands are located in the Collins River watershed.

Stream Name / ID #: Miller Branch (#TN05130107006_0430)
Public Notice, NRS 10.162
Page 4 of 9
Ecoregion: Eastern Highland Rim (#71g)
Stream Dimension: Channel bottom width: 15 ft. – 20 ft.
Chanel top width: 20 ft. - 25 ft.
Bank height: 5 ft. – 7 ft.
Substrate: pebble, soil
Assessment Date: not assessed
Special Designation: Exceptional Tennessee Waters due to the presence of the state endangered Barrens Darter and Barrens Topminnow
All other streams have not been assessed to determine if they support classified uses.
PERMIT COORDINATOR: Trent Thomas

FACTORS CONSIDERED: In deciding whether to issue or deny a permit, the department will consider all comments of record and the requirements of applicable federal and state laws. In making this decision, a determination will be made regarding the lost value of the resource compared to the value of any proposed mitigation. The department shall consider practicable alternatives to the alteration. The department shall also consider loss of waters or habitat, diminishment in biological diversity, cumulative or secondary impacts to the water resource, and adverse impact to unique, high quality, or impaired waters.

COMMENTING: Persons wishing to comment on the proposal are invited to submit written comments to the department. Written comments must be received within thirty days of the date that this notice is posted. Comments will become part of the record and will be considered in the final decision. The applicant's name and permit number should be referenced. Send all written comments to the department's address listed below and to the attention of the permit coordinator.

PUBLIC HEARING: Interested persons may request in writing that the department hold a public hearing on this application. The request must be filed within the comment period, indicate the interest of the person requesting it, the reasons that the hearing is warranted, and the water quality issues being raised. When there is sufficient public interest in water quality issues, the department will hold a public hearing. Send all public hearing request to the department's address listed below and to the attention of the permit coordinator.

APPEAL: A petition for permit appeal may be filed, pursuant to T.C.A. §69-3-105 by the permit applicant or by any aggrieved person who participated in the public comment period whose appeal is based upon any of the issues that were provided to the commissioner in writing during the public comment period or in testimony at a formal public hearing on the permit application. Any petition for permit appeal shall be filed with the board within thirty (30) days after public notice of the commissioner's decision to issue or deny the permit. Such petition must state in numbered paragraphs the basis of the appeal as required by the Administrative Procedures Act and promulgated regulations. The petition must be prepared on 8W' x 11" paper, addressed to the Water Quality Control Board and filed in duplicate at the address listed below. Any hearing would be in accordance with T.C.A. §§69-3-110 and 4-5-301 et seq.

FILE REVIEW: The permit application, supporting documentation including detailed plans and maps, and related comments are available at the department's address (listed below) for review and/or copying.

Tennessee Department of Environment & Conservation
Division of Water Pollution Control, Natural Resources Section
7th Floor L & C Annex
401 Church Street
Nashville, TN 37243

Click here to download a PDF file with maps of the proposed alignment area.